![](https://www.gartek.pt/wp-content/uploads/2022/06/2017-11-20_16A74432-2.png)
< Clients
NACEX
Sector: Logistics
Location: Água Longa
Following the increase in its national distribution network, Nacex Portugal hired Garcia, Garcia to design and build a new logistics centre in the Greater Porto area.
The maintenance of HVAC systems, hydraulics, electrical installations, fire safety, levellers and shelters is guaranteed by Gartek as well as all after-sales services to ensure maximum quality in the operation of the installations.
![](https://www.gartek.pt/wp-content/uploads/2022/06/DJI_0080.png)
![](https://www.gartek.pt/wp-content/uploads/2022/06/Foto-1-2.png)
![Foto (1)](https://www.gartek.pt/wp-content/uploads/2022/06/Foto-1-11.png)